Craig Davies

The full extent of the swimming pool extension is now visible from the car park and testing of the swimming pool has been taking place. It will be sometime until we take a dip, although I have heard the Mere itself is warm this time of year!!!

We have been hard at work developing a scheme to revitalise an existing square within a North West town centre.

Our proposals look to create a unified corporate image through our choice of materials while providing a number of differing units to suit potential tenants. Some are designed as single storey units while others will span two floors. One covers first floor only and is envisaged as a larger anchor unit.

Each unit has been designed to reflect the structural bays of the existing building which enables the client to ‘pick and mix’ the unit types depending on construction cost and potential tenant. This creates a varied street scene without detracting from the overall corporate identity of the square.

© 2010 NJSR news